University Library

It is the largest foundation university library in Istanbul, with a capacity that allows 1,044 people to use it at the same time.
It was built as a donation to the university by BIM, Turkey's largest retailer.
It was very enjoyable for me and my team to provide technical consultancy to the BIM Board of Directors, the University board of trustees and the university technical staff on the gross concrete works, the architecture of the project, stairs, lighting, the selection of natural products in the materials used, and all these decisions.
The technical support we provided to the tender process management, especially in electrical and mechanical infrastructure works, was very important.
During the construction site inspection process, my team and I carried out very detailed site inspections.
The result was quite impressive.
Power in Numbers
145844
Total Construction Area (sq.ft)
18
Construction Completion Time (month)
80000
Land Area (sq.ft)
Project Gallery